Formwork: 30500 m2
Excavation: 45,000 m3
Piling: 2300 Mt.
Reinforcement erection: 735 Tons
Concrete casting: 13.280m3
Chimney, Height: 60 Mt., Diameter: 220 Cm
Steel Structure Manufacturing & installation: 1.700
Tons
Corrugated steel Facade and roof cladding: 8.650m2
Technological
installations
Glass Furnace, Capacity: 300,000 Tons/Year
Glass Furnace Refractory Brick LinigWorks:2800 Tons
Installation of Glass Production Machinery and Equipment.
Conveyors and Material handling Systems.
Cooling system fans and Cooling air Ducts.
Compressors, Generator, Cooling Towers Installation
Gas Boiler (744 kW),and Waste Heat Boiler (2400 kW)
Installation
Cooling system fans and Cooling air Ducts
Mechanical
works
Supply and Installation of Heating System
Compressed air piping size up to DN 300
Cooling system
Fire Fighting System (sprinkler and Fire hose cabinets)
Sanitary and Domestic water system Installations.
Ventilation system Installations
Electrical
works
10 kV Medium Voltage System (Transformer & Panels)
0,4 kV Main & Distribution Panel boards
MCC Panel boards and BMS System
Internal & External Lighting System
Power Distribution System
Fire Alarm System
Public Address System
Telephone & Data System
Grounding & Lightning Protection System
Landscaping
: 17,000 m2