Ruscam Glass Container Plant Phase 3
 
 
 

 

 
 

 

 
 

Ruscam Glass Container Plant Phase 3

   

 
Employer:
Ruscam Ltd.
   
Location:
Gorokhovets, Vladimirsky Region, Russia
   
Project Start date:
30.08.2003
   
Project Finish date:
31.05.2004
     

 

Scope of Works

 

Civil works

Formwork: 22.600 m2
Excavation: 55,000 m3
Piling: 4200 Mt.
Reinforcement erection : 785 Tons
Concrete casting : 13.126m3
Chimney: Height 60 Mt.; Diameter: 260 Cm.
Steel Structure Manufacturing & installation:1.950 Tons
Corrugated steel Facade and roof cladding:15.000m2

Technological installations

Glass Furnace, Capacity: 400,000 Tons/year
Installation of Glass Production Machinery and Equipment.
Conveyors and Material handling Systems.
Compressors, Generator, Cooling Towers Installation
Gas Boiler (744 kW),and Waste Heat Boiler (2400 kW) Installation
Cooling system fans and Cooling air Ducts

Mechanical works

Supply and Installation of Heating System
Compressed air piping Installation ,size up to DN 300
Cooling system Piping Installations
Fire Fighting System Installation(sprinkler and Fire hose cabinets)
Sanitary and Domestic water system Installations
Ventilation system

Electrical works

10 kV Medium Voltage System (Transformer & Panels)
0,4 kV Main & Distribution Panel boards
MCC Panel boards and BMS Sytem
Internal & External Lighting System
Power Distribution System
Fire Alarm System
Public Address System
Telephone & Data System
Grounding & Lightning Protection System

Landscaping :7.260 m2

     